Witness Testimony
The Honorable Rosa L. DeLauro
CT-3 U.S. House of Representatives 2262 Rayburn House Office Building
Washington, DC, 20515
Regional Energy Reliability and Security: DOE Authority to Energize the Cross Sound Cable
Subcommittee on Energy and Air Quality
May 19, 2004
10:00 AM
Mr. Chairman, distinguished colleagues, thank you for this opportunity to
share with you my concerns regarding the Cross Sound Cable which stretches from
New Haven Harbor in New Haven, Connecticut, through the Federal Navigation
Channel, and across the Long Island Sound to Brookhaven, New York. I am grateful
to have this opportunity.
Mr. Chairman, to allow this transmission cable to operate indefinitely
without complying with the conditions and requirements outlined in both the
federal and state permits issued for the construction and installation of the
cable is to condone the kind of poor energy planning that no one here wants. In
that sense, I also ask that you not penalize the hundreds of commercial shipping
and family fishing vessels that use New Haven Harbor by intervening in this
dispute between the states and allowing this cable to operate.
Since its initial proposal in 2001, the Cross Sound Cable has found steady
and vocal opposition in Connecticut - not just among those elected officials who
are often quoted in the daily newspapers, but from communities of all
backgrounds. Environmental groups, the fishing industry, the harbor pilots who
utilize New Haven Harbor's Federal Navigation Channel, and concerned citizens -
groups which rarely share common interests all came together in an effort to
stop the installation of this electric transmission line.
The proposal went through the regulatory process both at the state and
federal levels and eventually received the necessary permits for construction
and installation. However, these permits were not issued without consideration
of the valid environmental, economic, and navigational impacts this project
would have on both the Federal Navigation Channel and the Long Island Sound.
In both the federal and state permitting process, numerous conditions were
outlined by regulatory bodies and accepted by Cross Sound Cable. Among those
conditions was the requirement that the cable be buried, quote, "no less
than 6 feet below the seabed or to an elevation of minus-48 feet mean lower low
water, whichever is greater, within the Federal Navigation Channel in New Haven
Harbor." In addition, under the permits, specific technology was accepted
which was to be used by the company to install the cable.
Unfortunately, Cross Sound Cable did not heed the warnings of harbor pilots
and fisherman-many of whom come from families who have utilized the Harbor for
generations-that it would be impossible for them to install this cable at the
required depths throughout the Channel using these techniques because they would
come into contact with bedrock. Instead of returning to the proverbial drawing
board, the company chose to move forward and, as predicted, ran into problems in
several areas where they were unable to meet the required depth conditions. It
is my understanding that in one of these problem areas, it is probable that the
company will not be able to meet this requirement without doing significantly
more damage to the Channel.
Following the multi-state blackouts of August 2003, Energy Secretary Spencer
Abraham issued an emergency order that allowed the cable to operate
indefinitely. The basis of his decision was that the Cross Sound Cable would act
to stabilize the electric grid. On May 7th of this year, Secretary Abraham
issued another order that called for the cable to cease operations. In issuing
his May 7th order, Secretary Abraham found that the emergency conditions that
required activation of the cable no longer existed. I applaud the Secretary for
recognizing the reality of current conditions and acting appropriately.
In the last month, both the New York Independent System Operator (NYISO) and
the New England Independent System Operator (ISO - NE)-the two organizations
responsible for operating the regions' electric power grid-have released reports
on electricity supplies for the summer of 2004. Both reports expressed
confidence that, with normal summer weather, there will be an adequate supply of
electricity to meet demands. Even in the event that summer weather conditions
are unusually warm, this is no justification for reactivating the cable.
Put simply, Cross Sound Cable, LLC has a responsibility to meet the
conditions of both the federal and state permits. Until it can do so without
further degradation of the New Haven Harbor or Long Island Sound, Cross Sound
Cable should not be able to financially benefit from the operation of the cable.
That is simply a matter of good, responsible business practice.
The Secretary's August 17th order and efforts to legislate the activation of
this cable represent an unfortunate decision to trump the regulatory measures
taken by several other federal agencies, including the Army Corps of Engineers,
the EPA and the Fish and Wildlife Service. That order, HR 6, and the legislation
introduced by members of the New York delegation, all represent a real assault
on state and federal regulatory decisions.
Failure to address the very real concerns of federal and state regulators
would essentially allow a company's bottom line to supercede any and all
regulatory authority. That is not good public policy. It is a dangerous path to
travel, and I hope the committee recognizes the need to remove this language
from the Energy Bill before it is reconsidered.
With that, I would like to again thank the Chairman and the distinguished
ranking member for giving me this opportunity today. Thank you.
|